Simulation on Dam Concrete Construction Processes Using Dynamic Resources Matching Technology

2009 
Focusing on concrete construction process of arch dam by cable cranes, based on queued service system theory and dynamic resources matching technology, the simulation model with the core of dynamic resources allocating and matching is constructed, and then the simulation is carried on to optimize the construction processes. A sample shows that the simulation results carry more details of construction, which made by dynamic optimization model. And the time utilization of construction is optimized.