Study on duration calculate model of railway construction based on LSM

2015 
Reasonable duration is very important in terms of construction. This study presents a new model for calculate the railway construction project duration by means of linear Scheduling method. It gives two kinds of activity combination, the two respectively the calculation method of combination of the construction duration. And the duration of the validity of the proposed method are determined verified by an actual railway project instance.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    14
    References
    1
    Citations
    NaN
    KQI
    []