Foundation structure designs for Chinese 10 MW wind turbines, for two moderately deep sites offshore Point Conception, CA, were studied by student-faculty teams at the National University of Singapore (NUS). A fixed tripod was selected for the 40 m (133 ft) deep site. A compliant Tension Leg Platform (TLP) was selected for the 75 m (250 ft) deeper site. These depths are beyond the reach of traditional monopile caisson foundations.