Full lock chamber water -carriage system that can adapt to extensive high -lift lock

2015 
The utility model provides a full lock chamber water -carriage system that can adapt to extensive high -lift lock, including the lock chamber, both sides owner's corridor, first diffluence pass, the medium counts corridor, the second diffluence pass, go out a water corridor, the apopore, the energy dissipation apron, first diffluence pass is located the lock chamber middle part, including two imports and two exports, adopt three -dimensional reposition of redundant personnel pattern, the second diffluence pass is located the position of lock chamber length 14 and 34, every second diffluence pass includes an import and four exports, adopt big cavity from shunting the structure, the facade that props up the corridor is trapezoidally, the rivers flow direction of arranging when filling water reduces along the journey, the apopore is evenly arranged at the top, the energy dissipation of energy dissipation apron is adopted at the apopore top. The utility model discloses can reduce the vertical cross flow of lock chamber water delivery in -process rivers, improve the condition of berthing of boats and ships in the lock chamber, improve the security of boats and ships lockage, improve lock chamber water delivery efficiency and increase passenger -cargo freight volume, through simplifying lock chamber second diffluence pass size, avoid because of the too complicated easy cavitation cavitation corrosion problem that appears of second diffluence pass size.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []