개별요소법을 활용한 면판형 토압식 쉴드TBM의 수치해석 연구

2017 
The Discrete Element Method (DEM) has been widely used in civil engineering as well as various industrial fields to simulate granular materials. In this study, DEM was adopted to predict the performance of the face plate-type earth pressure balance (EPB) shield TBM (Tunnel Boring Machine). An analysis of the TBM excavation performance was conducted according to two pre-defined excavation conditions with the different rotation speeds per minute (RPM) of the cutterhead. The TBM model which was used in this study has a 6.64 m of diameter and six spokes. Also, 37 precutters and 98 scrapers at an each spoke were modeled with a real-scale specification. From the analysis, compressive forces at the cutterhead face, shield and cutting tools, resistant torques at the cutterhead face, muck discharge rate and accumulated muck discharge by the screw auger were measured and compared.