J-PARC Neutrino Beamline Upgrade Technical Design Report
2019
In this document, technical details of the upgrade plan of the J-PARC neutrino beamline for the extension of the T2K experiment are described. T2K has proposed to accumulate data corresponding to $2\times{}10^{22}$ protons-on-target in the next decade, aiming at an initial observation of CP violation with $3\sigma$ or higher significance in the case of maximal CP violation. Methods to increase the neutrino beam intensity, which are necessary to achieve the proposed data increase, are described.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
35
References
7
Citations
NaN
KQI