Pile Foundation Design Analysis of Chuangyejie Office Building

2010 
The building's foundation scheme was under the control of the design requirement and the engineering geological condition of the construction site.The ultimate bearing capacities of single piles with different lengths and diameters were compared for selecting the bearing stratum and determining the pile's length and diameter.On the above analysis,the pile construction and the bearing platform construction were designed and their strengths were checked.Finally ANSYS was used to calculate the settlement of the group pile foundation and found that it met the regulatory requirements.So the design was applicable for constructing the building.