Anti-crack design of circumferential crack and longitudinal crack on hydraulic pressure tunnels lining for seepage control

2012 
By the reason of circumferential crack and longitudinal crack on hydraulic pressure tunnel lining,the computation method of circumferential stress and longitudinal stress is obtained and the principales of anti-crack and computation method of expansion joint spacing are brought up.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []